Project Assets
Land schedule, utilities, and proposal support documents.
The brief includes a large land record schedule, utility availability notes, and a proposal checklist that supports project presentation and institutional discussions.
Water Supply
Water Supply
Water availability noted from dam supply, supported by pipeline and tank infrastructure.
Power Connectivity
Power Connectivity
33 kV grid connection indicated at approximately 1 km from the proposed project site.
Land Snapshot
Sample entries from the survey and ownership schedule.
The PDF includes an extended owner-and-survey list. Below is a representative snapshot for website presentation, while the full record can remain part of due diligence documents shared privately.
| Survey No. | Area | Owner / Entry |
|---|---|---|
| 2 | 3.30 | Balchand, son of Giridhari |
| 3 | 2.45 | Fatesingh, son of Giridhari |
| 7 | 3.95 | Shivnarayan, son of Giridhari |
| 58/1 | 1.04 | Gokul, son of Ramsingh |
| 64 | 7.19 | Government record entry |
| 340 | 2.07 | Linked owner cluster in project schedule |
Proposal Checklist
Documents referenced inside the brief.
Land details
Khatuni records
State industrial department recommendation
SPV formation documents
Water availability proof
Electricity availability details
PAN, ATR, and ITR for the last three years