The brief includes a large land record schedule, utility availability notes, and a proposal checklist that supports project presentation and institutional discussions.

Water Supply

Water Supply

Water availability noted from dam supply, supported by pipeline and tank infrastructure.

Power Connectivity

Power Connectivity

33 kV grid connection indicated at approximately 1 km from the proposed project site.

Land Snapshot

Sample entries from the survey and ownership schedule.

The PDF includes an extended owner-and-survey list. Below is a representative snapshot for website presentation, while the full record can remain part of due diligence documents shared privately.

Survey No. Area Owner / Entry
2 3.30 Balchand, son of Giridhari
3 2.45 Fatesingh, son of Giridhari
7 3.95 Shivnarayan, son of Giridhari
58/1 1.04 Gokul, son of Ramsingh
64 7.19 Government record entry
340 2.07 Linked owner cluster in project schedule
Approx. total noted in the extracted brief: 118.60 Land schedule appears tied to Amanpura-side entries and multi-owner survey parcels.

Proposal Checklist

Documents referenced inside the brief.

Land details Khatuni records State industrial department recommendation SPV formation documents Water availability proof Electricity availability details PAN, ATR, and ITR for the last three years